Owner
: Sunoco Chemical
Project Location
: Kenova, West Virginia
Project Dates
: Rental Began in December 2009
Project Description
: Sunoco is decommissioning their existing coal boiler and installing a new natural gas fired boiler. ESI's 72,000 pph rental boiler is being used to supplement Sunoco's existing natural gas fired boiler. It will also be available to produce steam if the existing gas fired boiler was to go down..
ESI Solution
: ESI has rented a 72,000 pph package boiler to Sunoco Chemical. This rental will provide the additional steam the plant requires and be a back up boiler for the existing gas boiler. The rental will be in place until the new natural gas fired boiler is installed.