Natural Gas / Fuel Oil

Wausau Paper Mills Steam Facility

250,000 PPH Natural Gas and #2 Fuel Oil Steam Facility

Wausau Paper Mills

Brokaw, Wisconsin

September 1994

ESI was the EPC Contractor for this 250,000 pph steam facility. This facility included one field-erected, 250,000 pph boiler designed to produce 300 psig, 550°F superheated steam firing natural gas or # 2 fuel oil, along with an 800 gpm demineralized water treatment system complete with three-train anion/cation units and a condensate polishing system for total plant feedwater requirements, and complete waterside auxiliaries including a 675,000 pph deaerator, new boiler feedwater pumps for all facility boilers, and a new distributed control system for all facility boilers. This system was housed in a new three-story building.