Natural Gas / Fuel Oil
Appleton Papers Steam Facility
150,000 PPH Natural Gas and #6 Fuel Oil Steam Facility
Owner: Appleton Papers
Project Location: Roaring Spring, Pennsylvania
Project Completion: October 1996
Project Description:
ESI was the EPC Contractor for this 150,000 pph steam facility. This facility included one 150,000 pph boiler designed to produce 650 psig/750°F superheated steam firing natural gas or #6 fuel oil, along with a deaerator with boiler feedwater pumps, forced flue gas recirculation system, continuous emission monitoring system, Bailey INFI-90 distributed control system, and a new 50,000-gallon capacity #6 fuel oil tank. This system was housed in a new engineered structural steel building.