Project Spotlight
DTE Energy Services Stockton Plant
Coal Boiler Conversion to Biomass Firing Boiler System
Owner: Detroit Edison Energy Services (DTEES)
Project Location: Port of Stockton, California
Project Completion: 2nd Quarter, 2013
Project Description:
ESI was selected to provide complete engineering and procurement for the installation of a new 440 KH/HR stoker-fired boiler at the existing Port of Stockton Energy Plant, recently acquired by DTE Energy Services. Included with the boiler is a complete biomass receiving and storage facility and a state-of-the-art environmental clean-up system, consisting of a precipitator, SCR/CO catalyst, trona injection and wet scrubber. ESI will provide balance of plant engineering to incorporate the new equipment into the existing turbine generator and controls system.
