Material Handling Systems
Duke Energy
Ash Handling System
Owner: Duke Energy
Project Location: Cliffside, North Carolina
Project Completion: February 2001
Project Description:
ESI was the EPC Contractor for this ash handling and storage system on a large utility station. This system included: two pneumatic ash handling systems (one for precipitator unloading and one for transfer to an existing loadout silo) with a 1000-ton storage silo including controls and piping. The system design flow rate is 25 tons/hour.