Material Handling Systems

Department of Energy Savannah River Facility

Engineering for 20MW Biomass Plant

  Ameresco Federal SolutionsAmeresco Material Handling

  Aiken, South Carolina

  December 2011

The project includes installation of two bubbling fluidized bed boilers and a nominal 20MW steam turbine generator.  ESI designed and procured the material handling systems.  The receiving system is designed to receive, screen and size, and stack out up to 200 tons/ hour of biomass.  The reclaim system will provide 80 tons/ hour of biomass to the two boilers.

The material handling system consists of:

  • Two Truck ScalesAmeresco - Truck Tipper
  • Two Truck Dumps with Receiving Hoppers
  • One Emergency Reclaimer
  • Metal Removal
  • Conveyors
  • Hole and Disc Screen
  • Fuel Stackout & Storage
  • Reclaimers
  • Fuel Metering