Environmental Compliance

DTEES Stoneman Plant

Environmental Compliance – Coal Boiler to Biomass Firing Boiler System

Detroit Edison Energy Systems (DTEES)DTE Stoneman picture

  Cassville, Wisconsin

  June 2010

 ESI was selected to provide complete engineering for conversion of the two existing 27 MW pulverized coal-fired utility boilers at the DTEES owned Cassville facility to a biomass fired boiler system.  This included the retrofit of two (2) identical 1950 vintage Riley wall-fired coal boilers to stoker fired biomass units with a total capacity of 47 MW.

This conversion included replacement of the entire backend of the boiler island, including new selective non-catalytic reduction and electrostatic precipitator.