Engineering Study & Feasibility Analysis

Emory University Steam Facility

Construction Cost Estimate

Emory University

Atlanta, Georgia

July 2001

ESI prepared a construction cost estimate (+/-10%) for the installation of the mechanical equipment, boiler house and distribution piping (including supply and installation of distribution piping pipe bridge), electrical interconnect (including supply of MCC’s and lighting), local instrumentation, controls, and concrete block control room for a 120,000 pph steam plant addition to the university campus in accordance with engineered drawings.