Engineering Study & Feasibility Analysis
Emory University Steam Facility
Construction Cost Estimate
Owner: Emory University
Project Location: Atlanta, Georgia
Project Completion: July 2001
Project Description:
ESI prepared a construction cost estimate (+/-10%) for the installation of the mechanical equipment, boiler house and distribution piping (including supply and installation of distribution piping pipe bridge), electrical interconnect (including supply of MCC’s and lighting), local instrumentation, controls, and concrete block control room for a 120,000 pph steam plant addition to the university campus in accordance with engineered drawings.